Search
.Management Sciences
A. 1.250 D
B. 1.350 D
C. 1.425 D
D. 1.625 D
Related Mcqs:
- Pick up the correct statement from the following ?
- A. The sewer pipes of sizes less than 0.4 m diameter are designed as running full at maximum discharge B. The sewer pipes of sizes greater than 0.4 m diameter are designed as running 2/3rd or 3/4th full at maximum discharge C. The minimum design velocity of sewer pipes is taken as 0.8 m/sec D. … Pick up the correct statement from the following ?Read More...
- In normal conditions, the period for sludge digestion, is_______________?
- A. 10 days B. 20 days C. 30 days D. 60 days...
- If the pH value of sewage is 7__________________?
- A. It is acidic B. It is alkaline C. It is neutral D. None of these...
- In 1000 kg of sewage, the total solids approximate___________________?
- A. 0.5 to 1.0 kg B. 1 kg to 2.0 kg C. 5 kg to 7.5 kg D. 7.5 kg to 10 kg...
- Assertion A.: The minimum self cleansing velocity in the sewer, at least once a day, must be generated. Reason (R): If certain deposition takes place and is not removed, it obstructs free flow and causes further deposition leading to complete blocking of the sewer?
- A. Both A and R are true and R is the correct explanation of A B. Both A and R are true but R is not a correct explanation of A C. A is true but R is false D. A is false but R is true...
Recent Comments