The drainage area of a town is 12 hectares. Its 40% area is hard pavement ( K = 0.85), the 40% area is unpaved streets (K = 0.20) and the remaining is wooded areas (K = 0.15). Assuming the time of concentration for the areas as 30 minutes and using the formula Ps = 900/(t + 60) the maximum run off is__________________?

A. 0.10 cumec
B. 0.12 cumec
C. 0.15 cumec
D. 0.20 cumec

Leave a Reply

Your email address will not be published. Required fields are marked *