A. Wall thickness
B. Room area
C. W.C. area
D. Courtyard area
Related Mcqs:
- Pick up the correct statement from the following?
- A. The earth work of cutting in trenches or borrow pits in fairly uniform ground is measured with the help of average depths of the dead men B. The earth work in trenches or borrow pits in irregular ground is measured by taking the difference in levels before and after completion of work C. The … Pick up the correct statement from the following?Read More...
- The area of the cross-section of a road fully in banking shown in the given figure, is________________?
- A. [sb² + r² (2bd + sd)²]/(r² – s²) B. [sb² + r² (2bd + sd)²]/(r² – s5) C. [sb² + r² (2bd + sd)²]/(r – s) D. None of these...
- The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is_______________?
- A. Rs. 400 B. Rs. 425 C. Rs. 450 D. Rs. 500...
- The measurement is made for stone work in square metre in case of________________?
- A. Wall facing B. Columns, lintels, copings C. Building work D. A. and D. of the above...
- The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is ________________?
- A. 1.00 m3 B. 1.25 m3 C. 1.50 m3 D. 1.75 m3...