.Management Sciences
A. 26,000 m3
B. 26,500 m3
C. 27,000 m3
D. 27,500 m3
Related Mcqs:
- Pick up the correct statement regarding the centre line method of estimating a building?
- A. Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item B. The centre line is worked out separately for different sections of walls of a building C. The centre line length is reduced by half the layer of main wall joining the partition … Pick up the correct statement regarding the centre line method of estimating a building?Read More...
- The measurement is not made in square metres in case of________________?
- A. D.P.C. (Damp proof course) B. Form works C. Concrete Jeffries D. R.C. Chhajja...
- The order of booking dimensions is________________?
- A. Length, breadth, height B. Breadth, length, height C. Height, breadth, length D. None of these...
- The expected out turn of half brick partition wall per mason per day is___________________?
- A. 1.5 m 3 B. 2.0 m3 C. 4.0 m2 D. 5.0 m2...
- Pick up the correct statement from the following?
- A. The bent up bars at a support resist the negative bending moment B. The bent up bars at a support resist the sharing force C. The bending of bars near supports is generally at 45° D. All the above...