Search
.Management Sciences
A. In order to check up the average depth of excavation, ‘Dead man s’ are left at the mid-widths of borrow pits
B. The earthwork calculation in excavation is made from the difference in levels obtained with a level
C. The earth work in excavation to form the road embankment includes the formation of correct profile and depositing the soil in layers
D. All the above
Related Mcqs:
- While estimating the qualities for the construction of a building, the correct metric unit is________________?
- A. Metre for length B. Cubic metre for area C. Square metres for volume D. Litre for capacity...
- The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as_______________?
- A. Excavation B. Surface dressing C. Cutting D. Surface excavation...
- The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is__________________?
- A. (6 + 15) chains B. (6 + 12) chains C. (6 + 18) chains D. None of these...
- The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended___________________?
- A. 100 mm B. 150 mm C. 200 mm D. 175 mm...
- The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is ________________?
- A. 1.00 m3 B. 1.25 m3 C. 1.50 m3 D. 1.75 m3...
Recent Comments