A. One or more than one brick wall
B. Brick work in arches
C. Reinforced brick work
D. Half brick wall
Related Mcqs:
- In the mid-section formula__________________?
- A. The mean depth is the average of depths of two consecutive sections B. The area of mid-sections is calculated by using mean depth C. The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections D. All of the above...
- For the construction of buildings, the subheads of the estimate are________________?
- A. Earthwork, Concrete work, Brick work B. Brickwork, Stone work, Roofing C. Brickwork Flooring, Wood work, Steel work D. All the above...
- The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is__________________?
- A. (6 + 15) chains B. (6 + 12) chains C. (6 + 18) chains D. None of these...
- The correct Prismoidal formula for volume is________________?
- A. D [first area + last area + Even area + 2 odd areas] B. D/3 [first area + last area + 4 Even area + 2 odd areas] C. D/3 [first area + last area + 2 Even area + 4 odd areas] D. D/6 [first area + odd areas]...
- For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is_______________?
- A. 0.90 m3 B. 0.94 m3 C. 0.98 m3 D. 1.00 m3...