Search
.Management Sciences
A. 2 kg/tonne
B. 6 kg/tonne
C. 9 kg/tonne
D. 20 kg/tonne
Related Mcqs:
- If the optimistic time, most likely time and pessimistic time for activity A are 4, 6 and 8 respectively and for activity B are 5, 5.5 and 9 respectively, then______________?
- A. expected time of activity A is greater than the expected time of activity B B. expected time of activity B is greater than the expected time of activity A C. expected time of both activities A and B are same D. none of the above...
- Rolling resistance of a wheel depends upon_____________?
- (i) Vehicle load (ii) Grade (iii) Ground select the correct statements? A. only (i) is correct B. (i) and (ii) are correct C. (i) and (iii) are correct D. (ii) and (iii) are correct...
- Sensitivity analysis is a study of__________________?
- A. comparison of profit and loss B. comparison of assets and liabilities C. change in output due to change in input D. economics of cost and benefits of the project...
- Which of the following earth moving machines has the shortest cycle time?
- A. Drag line B. Hoe C. Clam shell D. Dipper shovel...
- If an activity has its optimistic, most likely and pessimistic times as 2, 3 and 7 respectively, then its expected time and variance are respectively___________________?
- A. 3.5 and 5/6 B. 5 and 25/36 C. 3.5 and 25/36 D. 4 and 5/6...
Recent Comments