.Management Sciences
A. should invest in neither of the two projects
B. could invest in either of the two projects
C. should invest in project A
D. should invest in project B
Related Mcqs:
- Select the incorrect statement?
- A. Start float and finish float are always equal B. Total float can be either start float or finish float C. Start float and finish float need not be equal D. Start float and finish float are the differences between activity times and not event times...
- A wheeled tractor hauling unit is working on firm earth. The total loaded weight distribution of this unit is: Drive wheels : 25000 kg Scraper wheels : 10000 kg If the coefficient of traction for wheeled tractor on firm earth is 0.5, the rimpull which this tractor can exert without slipping is_______________?
- A. 10000 kg B. 12500 kg C. 22500 kg D. 5000 kg...
- The maximum rimpull in the first gear of a tractor while towing a load is 6300 kg. The tractor weighs 12.5 tonnes and is operating along a 2 percent upgrade and the rolling resistance is 45 kg/tonne. Pull available for towing the load is________________?
- A. 3425 kg B. 5515 kg C. 4350 kg D. 2975 kg...
- If the scheduled completion time of a project is more than the earliest expected time for completion of the project, then the probability of completion of the project within the scheduled completion time will be__________________?
- A. 50% B. less than 50% C. more than 50% D. 100%...
- Slack time refers to_______________?
- A. an activity B. an event C. both event and activity D. none of the above...