Search
.Management Sciences
A. 5 day BOD is the ultimate BOD
B. 5 day BOD is greater than 4 day BOD keeping other conditions same
C. 5 day BOD is less than 4 day BOD keeping other conditions same
D. BOD does nof depend on time
Related Mcqs:
- The distribution mains are designed for________________?
- A. maximum daily demand B. maximum hourly demand C. average daily demand D. maximum hourly demand on maxi¬mum day...
- A pipe conveying sewage from plumbing system of a single building to common sewer or point of immediate disposal is called________________?
- A. house sewer B. lateral sewer C. main sewer D. submain sewer...
- The relative stability of a sewage sample, whose dissolved oxygen is same as the total oxygen required to satisfy BOD, is______________?
- A. 1 B. 100 C. infinite D. zero...
- The means of access for inspection and cleaning of sewer line is known as_______________?
- A. inlet B. manhole C. drop manhole D. catch basin...
- The velocity of flow of water in a sedimentation tank is about__________________?
- A. 5 to 10 cm/sec. B. 15 to 30 cm/sec. C. 15 to 30 cm/minute D. 15 to 30 cm/hour...
Recent Comments