Search
.Management Sciences
A. 1.5
B. 2.0
C. 2.5
D. 3.0
Related Mcqs:
- 1% of voids in a concrete mix would reduce its strength by about______________?
- A. 5% B. 10 % C. 15% D. 20%...
- For walls, columns and vertical faces of all structural members, the form work is generally removed after______________?
- A. 24 to 48 hours B. 3 days C. 7 days D. 14 days...
- The permissible diagonal tensile stress in reinforced brick work is_____________?
- A. about 0.1 N/mm2 B. zero C. 0.3 N/mm2 to 0.7 N/mm2 D. about 1.0 N/mm2...
- If the depth of neutral axis for a singly reinforced rectangular section is represented by kd in working stress design, then the value of k for balanced section_______________?
- A. depends on as, only B. depends on aCbC only C. depends on both crst and acbc D. is independant of both ast and acbc where d is the effective depth, ast is per-missible stress in steel in tension and ocbc is permissible stress in concrete in bend¬ing compression...
- Cube strength of controlled concrete to be used for pretensioned and post-tensioned work respectively should not be less than__________________?
- A. 35 MPa and 42 MPa B. 42 MPa and 35 MPa C. 42 MPa and 53 MPa D. 53 MPa and 42 MPa...
Recent Comments