Search
.Management Sciences
A. sloping drain
B. catchwater drain
C. side drain
D. cross drain
Related Mcqs:
- For the design of super elevation for mixed traffic conditions, the speed is reduced by_____________?
- A. 15% B. 20% C. 25% D. 75%...
- The camber of road should be approximately equal to___________________?
- A. longitudinal gradient B. two times the longitudinal gradient C. three times the longitudinal gradient D. half the longitudinal gradient...
- The particular places where pedestrians are to cross the pavement are properly marked by the pavement marking known as________________?
- A. stop lines B. turn markings C. crosswalk lines D. lane lines...
- Which of the following tests measures the toughness of road aggregates ?
- A. crushing strength test B. abrasion test C. impact test D. shape test...
- Tie bars in cement concrete pavements are at______________?
- A. expansion joints B. contraction joints C. warping joints D. longitudinal joints...
Recent Comments