Search
.Management Sciences
A. Quantity of binder required for tack coat is less than that required for prime coat
B. Prime coat treatment is given for plugging the voids in water bound macadam during bituminous road construction
C. Seal coat is the final coat over certain previous bituminous pavements
D. A bitumen primer is a high viscosity cutback
Related Mcqs:
- The terrain may be classified as rolling terrain if the cross slope of land is______________?
- A. upto 10% B. between 10% and 25% C. between 25% and 60% D. more than 60%...
- The value of ruling gradient in plains as per IRC recommendation is______________?
- A. 1 in 12 B. 1 m 15 C. 1 in 20 D. 1 in 30...
- Centre line markings are used_____________?
- A. to designate traffic lanes B. in roadways meant for two way traffic C. to indicate that overtaking is not permitted D. to designate proper lateral placement of vehicles before turning to different directions...
- Tyre pressure influences the______________?
- A. total depth of pavement B. quality of surface course C. both the above D. none of the above...
- The binder normally used in flexible pavement construction is________________?
- A. cement B. lime C. bitumen D. none of the above...
Recent Comments